BHD.Commercial

BHD Commercial / Blog

Useful thinking for the work in front of you.

Clear notes on contracts, forecasting and the commercial decisions that protect margin on live projects.

01

The UK Construction Payment Process: A Step-by-Step Compliance Guide

The UK Construction Payment Process: A Step by Step Compliance Guide Payment compliance is a control discipline, not an administrative afterthought. On a construction project, y…

Read article
02

NEC4 Compensation Events: A Step-by-Step Guide to Notifying Time and Cost

NEC4 Compensation Events: A Step by Step Guide to Notifying Time and Cost Under the NEC4 Engineering and Construction Contract (ECC), a compensation event changes the Prices, th…

Read article
03

NEC4 Early Warnings: The Clause 15 Process, Explained with a Simple Flowchart

NEC4 Early Warnings: The Clause 15 Process, Explained with a Simple Flowchart The NEC4 early warning process is a practical management discipline, not a procedural formality. Cl…

Read article
04

NEC4 Early Warnings: How the Clause 15 Process Protects Your Time and Money

NEC4 Early Warnings: How the Clause 15 Process Protects Your Time and Money NEC4 early warnings are not paperwork for its own sake. Used properly, the Clause 15 process gives yo…

Read article
05

7 Compensation Event Mistakes That Cost SME Contractors Thousands (And How to Fix Them)

7 Compensation Event Mistakes That Cost SME Contractors Thousands (And How to Fix Them) Compensation events are not paperwork exercises. Under NEC4, they affect your Prices, Com…

Read article
06

Professional Recognition in Cost Engineering and Quantity Surveying: Why CaSA and QSi Matter

Professional Recognition in Cost Engineering and Quantity Surveying: Why CaSA and QSi Matter Cost engineering, quantity surveying and project controls sit at the centre of good…

Read article
07

Construction Cost Inflation in 2026: How SME Contractors Can Protect Fixed-Price Margins

Construction Cost Inflation in 2026: How SME Contractors Can Protect Fixed Price Margins Construction cost inflation has moderated from the extreme levels seen in 2022. That doe…

Read article
08

Earned Value Without the Jargon: What PV, EV, AC, CPI, SPI and EAC Actually Tell a Contractor

Earned Value Without the Jargon: What PV, EV, AC, CPI, SPI and EAC Actually Tell a Contractor Earned value is one of the most misunderstood tools in construction. The terminolog…

Read article
09

Reporting That Gets Used: What Directors Need on One Page

Reporting That Gets Used: What Directors Need on One Page Most monthly reports are written to evidence that work was done, not to help anyone decide anything. That is why direct…

Read article
10

Change and Configuration Control: Keeping the Record Straight Across Packages and Interfaces

Change and Configuration Control: Keeping the Record Straight Across Packages and Interfaces On any project with more than one work package, the biggest commercial risk is not a…

Read article
11

Risk and Contingency: Why a Risk Register Nobody Reviews Is Worse Than None

Risk and Contingency: Why a Risk Register Nobody Reviews Is Worse Than None A risk register can look like control without providing any. If nobody reviews it, updates it or acts…

Read article
12

Schedule Control for Contractors: Critical Path, Float and the Records That Protect You

Schedule Control for Contractors: Critical Path, Float and the Records That Protect You Schedule control is not keeping a programme file tidy. It is knowing, at any point: where…

Read article
13

What Project Controls Actually Mean on a Construction Project — And Why They Are Not Just Reporting

What Project Controls Actually Mean on a Construction Project — And Why They Are Not Just Reporting Project controls are often mistaken for monthly reporting. That is too narrow…

Read article
14

Cost Control That Sees Movement Early: Forecasting, Commitments and Cost to Complete

Cost Control That Sees Movement Early: Forecasting, Commitments and Cost to Complete Most contractors see cost movement at month end. By then, the choices have narrowed. Labour…

Read article
15

Commercial Control for Contractors: Where Margin Actually Leaks and How to Stop It

Commercial Control for Contractors: Where Margin Actually Leaks and How to Stop It Commercial control is not the accounts department. It is not a monthly report and it is not an…

Read article
16

Delay Analysis and Extensions of Time: 7 Mistakes That Weaken a Contractor's Case

Delay Analysis and Extensions of Time: 7 Mistakes That Weaken a Contractor's Case Delay claims usually fail for a straightforward reason: the delay was not analysed and recorded…

Read article
17

How to Choose a Quantity Surveyor in the West Midlands: 10 Checks to Make Before You Appoint One

How to Choose a Quantity Surveyor in the West Midlands: 10 Checks to Make Before You Appoint One Choosing a quantity surveyor is not simply a matter of comparing day rates. The…

Read article