Project turnaround / Commercial Recovery

Recover margin before it becomes a claim.

When a project is drifting, the answer is not another spreadsheet. It is a clear view of what happened, what remains and which decisions will change the outcome.

When the project is telling you something

Intervene while there is still room to move.

Margin erosion often looks gradual: a forecast that is always a little late, change that is not quite captured, labour and supply chain pressure that stays in the noise. By the time it is obvious, the recovery window is smaller.

We bring a calm, senior view to the project and give the team a prioritised route back to commercial control.

SeeThe real position

DecideWhat changes it

RecoverThe value left

01

Commercial Audit

A fast, evidence-led review of contract position, cost, change, risk and the behaviours driving margin erosion.

02

Forecast Review

Reconcile the forecast to the project record, programme and remaining scope so the position is visible.

03

Recovery Plan

A prioritised plan that separates immediate protection from the structural changes needed to recover control.

04

Recovery Support

Hands-on senior support to implement the plan, challenge assumptions and keep the project moving forward.

The recovery conversation

You do not need every answer before you call.

Bring the information you have. A few honest facts about the project, the forecast and the pressure point are enough to start a useful assessment.

Project under pressure?

Arrange a Recovery Assessment.

Get a grounded view of the problem and a practical route toward the margin and control still available.

Arrange Recovery Assessment